No inspections in 12 months · Milwaukee, WI · 3 trucks.
DOT 9155719ActiveNew Entrant · month 5 of 18InterstateMILWAUKEE, WI
COMPANY
Authority since
—
MCS-150
—
Fleet
3 units · 2 trailers · 4 drivers
ADDRESS
Physical
8415 N 87TH ST MILWAUKEE, WI 53224-2409
Mailing
Same as physical
CONTACT
Phone
4143578515
Email
order@acechem.com
OFFICERS
Primary Officer
Jack R Stewart
Title
President
Email
jrstewart@acechem.com
OPERATION & CARGO
Operation classification
Private Property
Specialty
Tanker / Bulk Liquids
Cargo types
1
Chemicals
Self-reported by the company on its latest MCS-150 filing (FMCSA census). Reflects what the carrier is authorized and equipped to haul, not actual recent loads. Specialty is our summary of the declared cargo mix.
AUTHORITY
4 mo
Since USDOT registration
INSURANCE
Verification needed
No federal insurance filing found. Whether this carrier must file one is unclear from its registration; verify coverage through state records or the insurer.
RISK GRADE
Moderate Risk
1 risk factors · 0 strengths
OOS RATE
0.0%
0 / 0 inspections
Carrierintel Safety Score
Rolling 12-month heuristic based on inspections, OOS, violations, crashes & fatalities. Not the official FMCSA SMS score.
Not enough inspection or crash history to score this carrier yet.
Fleet vs Reality
last 12 months · power-unit VINs from roadside inspections
Verification needed — No federal insurance filing found. Whether this carrier must file one is unclear from its registration; verify coverage through state records or the insurer.
SUMMARY
Registered with USDOT 4 months ago — too new to rate as minimal risk
INDUSTRY REPORTS
ELD Tampering — Carriers cited for ELD tampering under 49 CFR § 395.8(e), by carrier and state.
Top Violations — The ten most-cited FMCSA violation codes of the last 30 days.
Phantom Fleets — Declared power units against the vehicles seen at roadside inspections.
English Proficiency — Carriers whose drivers were cited under 49 CFR § 391.11(b)(2), by carrier and state.
Methodology — Where the data comes from and how the Safety Score and Risk Grade are built.